前测 before measurement; pretest posttest design; pretesting 施工测量 construction survey; durability test .
基于1个网页-相关网页
After test: URto be applied for 30 minutes, 24 to 48 hours before measurement.
试验后:施加标称电压30分钟,于24至48小时之间测试。
In the laser tracking 3d coordinate measuring system, the self-calibration should be made before measurement that would take effect mostly on the result.
在激光跟踪干涉三维坐标测量系统中,系统的标定精度直接影响着系统最终测量精度。
Before the measurement, copy the CPU Time values, and then paste them on to a spreadsheet.
在测量前,拷贝cpu时间值并且把它们粘贴到电子表格。
应用推荐